Connecting underground infrastructure of Long Hau IP Expanded to Long Hau 3 IP – Phase 1
Connecting underground infrastructure of Long Hau IP Expanded to Long Hau 3 IP – Phase 1. At Long Hau 3 IP – Phase 1, the underground infrastructure is currently being connected to Long Hau Expanded IP. The connection is to supply clean water and drain off storm water and wastewater in Long Hau 3.
The investor, Long Hau Corporation (LHC) and the construction unit closely mornitor and strive to speed up infrastructure construction progress, to ensure its quality and ready for land handover to first clients in December.
Long Hau 3 IP – Phase 1 has an area of 123 ha. Since its announcement, the project gained significant attention from domestic and foreign businesses. Closely located to the existing Long Hau IP, the park takes advantage of connection with synchronous infrastructure of Long Hau IP and Long Hau Expanded IP.
Especially, Long Hau 3 IP – Phase 1 has a logistics park located front of Tan Lap – Long Hau street. The street is 80m wide, connecting to Highway 50 – Long An International Port. In the future, it will become an essential transportation route. Industrial plots in the logistics park have 2-3 fronts of the road which is an ideal advantage for logistics businesses.
Long Hau IP owns a strategic location, accessing to major transportation modes including air, waterway, and road transport. Long Hau offers diverse products from rental industrial land to factory for lease with flexible area, as well as develops a full range of support services to meet the need of businesses.
Over 13 years of establishment, Long Hau IP has created a sustainable investment environment for a community of 200 businesses.
Some photos of Long Hau IP 3 – Phase 1:
Address: Hamlet 3, Long Hau commune, Can Giuoc district, Long An province
Hotline: (+84 28) 3937 5599 – (+84) 906 938 599
Email: sales@longhau.com.vn
Fanpage: fb.me/longhau.com.vn
Zalo Official: https://zalo.me/2384735100152725129.